Implementation Support
Any physical preparation needed at your warehouse must be completed well ahead of the proposed live date. Although major changes most likely will be, smaller issues such as rack labelling, signage and preparation of work areas should be planned and executed well ahead of the required date.
Key to ensuring success at go-live is the user testing process. Although we test all configured systems before installation, we recommend pre-live user testing of all systems. Even where 100% standard it is vital that users check system set-up to ensure it matches operational expectations.
The penultimate process before live operation is to upload the dynamic operating data required for full system operation. There are different ways to do this, but the methods and procedures will be established well ahead of the live date.
Going live can be painless when projects are successfully run. Our project team can provide onsite support for as long as needed, but this will usually reduce after a week or two. The team will assist in a number of areas (with remote help if needed) to ensure successful continuity of the implementation.
Analysis & Design
Hardware & Systems
Networks Infrastructure
Hardware Sizing & Selection
Wireless & Peripherals
Pre-Live Preparation
Software Customisation
System Configuration
Interface Develop/Test
Data Load, Test & Release
Super-user Training
Implementation Support
Physical Warehouse Preparation
User Testing Processes
Dynamic Data Load
Go-Live
Project Management
Project Planning
Team Supervision
Monitoring & Reporting
Project Review
Customer Support
Standard Help Desk Support
Out of Hours Cover
Annual Review Visit
Web Portal Support